Hamworthy Hedgehog Rescue

No floor yet…

With 4mm of water on the floor of the shed I still can’t do anything with the flooring yet.

I have finished painting the inside of the shed, and have started on the electrics.

Consumer unit (fuse box) is in, with 6mm Steel Wire Armoured cable going back to the house. Every circuit is protected by it’s own RCBO for safety.

There will be 2 x 6ft LED strip lights and 8 double sockets fitted to make sure we have plenty of outlets to use.

Once we get a dry spell, I will take all the timber for the floor outside so that I can lay a damp proof membrane to stop the floor joists standing in water, which would rot them pretty quickly, even though they are tanalised. The floor boards are going to be treated with a clear timber preservative before they are laid as an extra protection.

The actual build of the shed went very quickly, but the fitting out is taking it’s time, it’s very frustrating as the weather is really holding me back.

Slowly, slowly, catchee monkey, as they say.

Leave a Reply

Your email address will not be published.

More Articles

News
Jim

New shed

A couple of weeks back, we posted a link to a competition to win a shed, asking people if they

Read More »
Hogs
Jim

Hoglets!

Cuteness alert!

We managed a quick peek at one of the litters of hoglets last night while changing their mum’s food and water bowl.

These hoglets are 6 days old. We think there is possibly a 4th hoglet under mum.

Read More »
Hogs
Jim

More hoglets

All I can say is that I hope we don’t have too many days and nights like last weekend!

Emergency after emergency. Four hogs giving birth, one of which produced four stillborn babies, two mothers had four babies each, and one had six!

Read More »