Today I have mostly been playing at being a kitchen fitter – I have made the cupboards (flat pack) and hung the wall units.

I still have to cut the worktop to size and then fit it to the base units.

I can now work out the position of the sockets and light switch, and fit them.

The floor boards are just about dry now, but the joists are still wringing wet, so I still can’t get the floor down, which is extremely frustrating.

Still, that’s another step closer to completion.

Leave a Reply

Your email address will not be published. Required fields are marked *

More Articles

Hogs
Jim

Entries today (7th July); 1 x adult male hedgehog with severe road traffic injuries and heavy blood loss, punctured abdomen,

Read More »
Uncategorised
Jim

Bournemouth Echo

Following our little piece in yesterdays Echo, we had 4 hedgehogs in overnight and this morning.One from Bournemouth College campus, which was brought in by a member of the college staff, one from Corfe-Mullen which had been found laying on the road, one from Wareham which sadly died before it got here, and one this morning from Upton that was found when a garden shed was being taken down.

Read More »